Xingzi County liquefied natural gas (LNG) project to develop applications





Item Number

Version

Project Phases

Project Type

383462

Version 1

Idea

New

Main construction phase

Body design phase

Body design phase

The total investment amount

Main construction tender has not yet started

Body design has not yet started

This phase NA (non-refined decoration items)

Two billion

Project Category

Decoration

Elevator

Oil and gas and chemical storage facilities / repair shop and shipyard

Uncertain

Uncertain

GFA

Jian cost / cost (real estate and industrial projects, excluding land, demolition, government taxes and other costs)

Floors

Covers

Two billion

140,810 square meters

Air conditioning

Heating mode

Exterior materials

Steel

Uncertain

Uncertain

Uncertain

Uncertain

Large-scale projects

Foreign participation

Owner Type

Published

Yes

Non-Foreign Investment

Business

2014-03-13 16:14

Procedures progress

The project is currently (2014-03-11) ongoing project siting, land formalities

Equipment acquisition case

The project is currently (2014-03-11) equipment procurement has not yet started, the specific procurement time Not given

Project Overview 
The project covers an area of approximately 140,810 square meters, the proposed liquefied natural gas (LNG) project to develop applications include - 
■ ships and cars modified base 
■ Filling Station 
■ bench test center 
■ Product Testing Center 
■ LNG gas storage center 
■ Logistics Center 
Note ︰ 
■ The project is expected to total investment of about 2 billion yuan 
■ The project is divided into two three-year period is completed, after the completion of the project, the annual revenue 40 million yuan or more. 
■ As of now (2014-03-11) According to reports, the project is in progress preliminary site work is expected to start the second half of the project design. 
■ expected procurement of equipment ︰ clean tube equipment, pressure systems, measurement systems, automation and control systems, valves, piping, remote monitoring and data acquisition system, fire-fighting facilities, instrumentation, valves, official website, pump, insulation materials, hydrophobic, valve metering systems, valves automation systems, 
Project duration 
Project Start Date: 2016 fourth quarter. Project End Date: 2019.